Documenting our disastrous move from leafy north London to the grungy south...

Sunday, 11 March 2012

Bathroom havoc

Oh joy... two weeks stretched ahead of us... sans bathroom. But we'd have done anything to be rid of the mould, the awful layout and the biggest bath in the smallest room!

Day one and everything (but the loo) was ripped out and a huge pile of rubble lay on the floor... eek! But I think pictures will tell this story...

Before

Our bathroom - reduced to rubble

A new layout idea...

A hose to flush the loo... we're classy we are!

New loo and a bath...

... and some tiles...

... a heater AND a shower head!

After



My beautiful taps...

... and shower
So it took a little more than two weeks... due to a self-inflicted disaster in our lounge room that needed our builders attention - but more to come on that later. But it was worth every non-flushing-loo day. I'm in love with it all... well, apart from the floor tiles which I lost out on! But eh, can't win 'em all.

No comments:

Post a Comment